Monaghan Mushrooms
The project comprised the construction of ten bunkers for compost manufacture together with three material and filling halls and a large external yard. The contract was predominantly all concrete works both in-situ and pre-cast, with Sika Sarnafil roof covering to the bunkers and a Baril paint coated structural steel frame. Material and filling halls featured impregnated glulam beams with Tegral cladding.
Project Details
Elliott Group delivered the project on time, and to the demanding specification requirements. It demonstrates the company’s ability to deliver high-quality industrial projects to exacting standards to fast-track programmes.
Design Team, Client & Value
Client: Monaghan Mushrooms
Architect: CS Pringle Consulting Engineers
Civil Engineer: CS Pringle Consulting Engineers
M&E Engineer: Monaghan Mushrooms
Quantity Surveyor: Rogerson Redden
Value: €4.9 million